On-Site in Weeks, Not Months .
How do we build so fast?
The industry standard lead time for an oak garage is 12–16 weeks. This is often because companies are waiting for timber imports or outsourcing their cutting to third parties.
We do it differently.
We Hold Stock: We keep a supply of structural Douglas Fir and Oak ready to go.
In-House Cutting: We don’t wait for a factory slot. We cut the frame ourselves in Stafford.
Standardised Efficiency: By using our “Customisable Standard” designs, we skip weeks of architectural drawing time.
The Timeline
Week 1
Design consultation & deposit.
Week 2
Manufacturing & cutting in our workshop.
Week 3/4
Delivery and installation on your prepared base.
A Note on Planning Permission
Please remember that while
Contact Us
Want to speak to the team about planning – we offer inhouse drawing and planning application submission services with a massive 90% success rate.

